The ready-mix industry (NRMCA) says to order 4% to 10% more than the plan dimensions give, for spillage, a low spot in the ground and forms that bow.
NRMCA: truck mixers carry 8 to 12 cubic yards (about 6 to 9 m³).
Compare prices (optional)
Prices from your store and your local ready-mix plant. Small orders often carry a short-load fee: ask, and put it under delivery.
ExampleConcrete to order
1.67cubic yards
75 bags of 80 lb, or part of one ready-mix truck.
Enter yours to see your result.
Bags, by size
Or ready-mix: part of one truck
Have prices? Compare bags with a truck under More options.
- Volume
- 44.9 cu ft with 10% extra
An estimate of materials to buy, not engineering or code advice. Check sizes with your supplier and local building department. Terms
My shopping list
Add each part of a job and print one list: a paver patio is base stone, bedding sand and the pavers; a fence is post holes. It stays on this device.
How this works: 9 sources,
How this works
Method
Solid steps poured against the ground are a staircase-shaped block. Seen from the side, the bottom step is one riser tall, the next two, and so on, so with n steps the lower ones add up to the run times 1 + 2 + … + (n − 1), and the top step or landing is n risers tall over its own depth. Multiply that side area by the width for the volume. Full method
Sources
- International Residential Code 2021: R311.3, R311.7.5, R403.1.1, R506.1 (International Code Council, 2021)
- QUIKRETE Concrete Mix (No. 1101) data sheet (QUIKRETE, revised October 2022)
- Sakrete High Strength Concrete Mix data sheet (Sakrete (Oldcastle APG), REV 7-10)
- Sakrete Concrete Mix product data sheet (30 kg) (Sika Canada)
- CIP 31, Ordering Ready Mixed Concrete (National Ready Mixed Concrete Association, 2023)
- CIP 8, Discrepancies in Yield (National Ready Mixed Concrete Association)
- Highway Maintenance Tables and Conversion Factors: loose and compacted weights of materials (Missouri Department of Transportation, Engineering Policy Guide)
- Seal Coat and Surface Treatment Manual: haul trucks, size (Texas Department of Transportation)
- NIST Handbook 44 (2026), Appendix C: General tables of units of measurement (National Institute of Standards and Technology, 2026)
How it’s tested
2 worked examples for this page are checked by automated tests before every release: given the inputs, the tool must show the expected answer.
Limits
An estimate of materials to buy, not engineering or code advice. Check sizes with your supplier and local building department.
Privacy
On your device. Nothing you enter or open leaves this browser. About privacy labels
Changes
- First published: draw any area and see bags on a pallet, yards or trucks, with 14 job and material pages and a shopping list kept on your device.
How the steps are worked out
Solid steps poured against the ground are a staircase-shaped block. Seen from the side, the bottom step is one riser tall, the next two, and so on, so with n steps the lower ones add up to the run times 1 + 2 + … + (n − 1), and the top step or landing is n risers tall over its own depth. Multiply that side area by the width for the volume.
For three steps 5 ft wide with a 7½ inch rise and 12 inch run, with the top step 12 inches deep too: 5 × 0.625 × (1 × (1 + 2) + 1 × 3) = 18.75 cubic feet, or 35 bags of 80 lb with 10% extra.
The International Residential Code limits risers to 7¾ inches and asks for treads at least 10 inches deep, and a landing at an outside door at least 36 inches deep in the direction of travel. The calculator flags a riser or tread outside those limits. Steps over a hollow core, or built over fill, take less concrete: subtract the fill as a cut-out on the slab page.
volume = width × rise × (run × n(n − 1) ÷ 2 + top × n)
- Riser height not more than 7¾ inches; tread depth not less than 10 inches (R311.7.5.1 and R311.7.5.2). Source: International Residential Code 2021: R311.3, R311.7.5, R403.1.1, R506.1.
- Landings at exterior doors must be at least 36 inches deep in the direction of travel (R311.3). Source: International Residential Code 2021: R311.3, R311.7.5, R403.1.1, R506.1.
Concrete for solid steps, 4 ft wide
7 in rise and 11 in run. The last two columns use a 36 in landing at the top; bags include 10% extra.
| Steps | Total rise | Top step 11 in | Top landing 36 in | 80 lb bags (landing) |
|---|---|---|---|---|
| 1 | 7 in | 2.1 cu ft | 7.0 cu ft | 13 |
| 2 | 14 in | 6.4 cu ft | 16.1 cu ft | 30 |
| 3 | 21 in | 12.8 cu ft | 27.4 cu ft | 51 |
| 4 | 28 in | 21.4 cu ft | 40.8 cu ft | 75 |
| 5 | 35 in | 32.1 cu ft | 56.4 cu ft | 104 |
| 6 | 42 in | 44.9 cu ft | 74.1 cu ft | 136 |
| 7 | 49 in | 59.9 cu ft | 93.9 cu ft | 173 |
| 8 | 56 in | 77.0 cu ft | 115.9 cu ft | 213 |
Common questions
How much concrete for 3 steps?
Three steps 4 ft wide with a 7 inch rise and an 11 inch run, the top step 11 inches deep, hold 4 × 0.583 × 0.917 × 6 = 12.8 cubic feet. With a 36 inch landing at the top it is 27.4 cubic feet, about 51 bags of 80 lb with 10% extra.
What rise and run should concrete steps have?
The IRC allows a riser of up to 7¾ inches and a tread of at least 10 inches, with no more than ⅜ inch difference between steps in a flight. A 7 inch rise and an 11 inch run is a common, comfortable pair.
Do I need a footing under steps?
Steps attached to a house often need footings below the frost line so they don’t heave away from the wall. Work the footing out on the footing or Sonotube page and add it to your list.