Concrete Footing Calculator
Draw the outline the footing runs round, give its width and depth…
Draw the outline the footing runs round, give its width and depth, and see the concrete to order for the whole trench.
More options10% extra · 80 lb bags · 10 yd³ truck
Extra to allow
The ready-mix industry (NRMCA) says to order 4% to 10% more than the plan dimensions give, for spillage, a low spot in the ground and forms that bow.
NRMCA: truck mixers carry 8 to 12 cubic yards (about 6 to 9 m³).
Compare prices (optional)
Prices from your store and your local ready-mix plant. Small orders often carry a short-load fee: ask, and put it under delivery.
ExampleConcrete to order
3.00cubic yards
135 bags of 80 lb, or part of one ready-mix truck.
Enter yours to see your result.
Bags, by size
Or ready-mix: part of one truck
Have prices? Compare bags with a truck under More options.
- Volume
- 80.8 cu ft with 10% extra
- Centre line
- 82.7 ft
An estimate of materials to buy, not engineering or code advice. Check sizes with your supplier and local building department. Terms
My shopping list
Add each part of a job and print one list: a paver patio is base stone, bedding sand and the pavers; a fence is post holes. It stays on this device.
How this works: 9 sources,
How this works
Method
A strip footing is a long rectangular trench of concrete, so its volume is its length times its width times its depth. The catch is the corners. If you measure the outline of the building to the outside of the footing and multiply by the width, every corner is counted twice. The calculator uses the footing’s centre line instead, which for a rectangle, L or T outline is the outside perimeter less four times the footing width. Full method
Sources
- International Residential Code 2021: R311.3, R311.7.5, R403.1.1, R506.1 (International Code Council, 2021)
- CIP 31, Ordering Ready Mixed Concrete (National Ready Mixed Concrete Association, 2023)
- QUIKRETE Concrete Mix (No. 1101) data sheet (QUIKRETE, revised October 2022)
- Sakrete High Strength Concrete Mix data sheet (Sakrete (Oldcastle APG), REV 7-10)
- Sakrete Concrete Mix product data sheet (30 kg) (Sika Canada)
- CIP 8, Discrepancies in Yield (National Ready Mixed Concrete Association)
- Highway Maintenance Tables and Conversion Factors: loose and compacted weights of materials (Missouri Department of Transportation, Engineering Policy Guide)
- Seal Coat and Surface Treatment Manual: haul trucks, size (Texas Department of Transportation)
- NIST Handbook 44 (2026), Appendix C: General tables of units of measurement (National Institute of Standards and Technology, 2026)
How it’s tested
2 worked examples for this page are checked by automated tests before every release: given the inputs, the tool must show the expected answer.
Limits
An estimate of materials to buy, not engineering or code advice. Check sizes with your supplier and local building department.
Privacy
On your device. Nothing you enter or open leaves this browser. About privacy labels
Changes
- First published: draw any area and see bags on a pallet, yards or trucks, with 14 job and material pages and a shopping list kept on your device.
How the footing is worked out
A strip footing is a long rectangular trench of concrete, so its volume is its length times its width times its depth. The catch is the corners. If you measure the outline of the building to the outside of the footing and multiply by the width, every corner is counted twice. The calculator uses the footing’s centre line instead, which for a rectangle, L or T outline is the outside perimeter less four times the footing width.
As a second example, take a 30 × 24 ft garage on a footing 20 inches wide and 10 inches deep. The outline is 108 ft round the outside; the centre line is 108 − 4 × 1.67 = 101.3 ft. 101.3 × 1.67 × 0.83 ft gives 140.7 cubic feet, or 5.22 cubic yards, before any extra.
The International Residential Code sets minimum footing sizes by the load and the soil, in its Tables R403.1(1) to R403.1(3), and spread footings must be at least 6 inches thick. Frost depth sets how deep the bottom of the footing goes, which changes the trench but not the concrete in it. Ask your building department for the size your project needs.
volume = (outside perimeter − 4 × width) × width × depth
- Spread footings must be at least 6 inches thick; widths come from the code’s tables by load and soil bearing capacity (R403.1.1). Source: International Residential Code 2021: R311.3, R311.7.5, R403.1.1, R506.1.
- Order 4% to 10% more than the plan dimensions give; trenches are rarely dug to the exact size. Source: CIP 31, Ordering Ready Mixed Concrete.
Concrete per length of footing
Volume for 10 ft and 100 ft of footing by size; bags are 80 lb for 10 ft with 10% extra.
| Width × depth | Per 10 ft | Per 100 ft | 80 lb bags per 10 ft |
|---|---|---|---|
| 12 × 6 in | 5.00 cu ft | 1.86 yd³ | 10 |
| 12 × 8 in | 6.67 cu ft | 2.47 yd³ | 13 |
| 16 × 8 in | 8.89 cu ft | 3.30 yd³ | 17 |
| 16 × 10 in | 11.11 cu ft | 4.12 yd³ | 21 |
| 18 × 8 in | 10.00 cu ft | 3.71 yd³ | 19 |
| 20 × 10 in | 13.89 cu ft | 5.15 yd³ | 26 |
| 24 × 12 in | 20.00 cu ft | 7.41 yd³ | 37 |
Common questions
How wide and deep should a footing be?
It depends on the load and the soil. The International Residential Code lists minimum widths in Tables R403.1(1) to (3), by the number of storeys, the kind of wall and the soil’s bearing capacity, and requires spread footings at least 6 inches thick. The bottom must be below the frost line. Your building department sets the size for your project.
Why does the calculator subtract four widths?
Because measuring round the outside counts each corner square twice. The centre line of the footing, which is what length × width × depth needs, is shorter than the outside perimeter by one width at each corner on two sides: four widths for any outline made of right angles.
Can I add piers or a thickened slab edge?
Work them out separately and add them: round piers on the Sonotube page, square pads as a slab with the pad’s thickness. Your shopping list can hold each one, so the printed list shows the whole pour.